Unsere Projekte

BMW

bmw

YearModel and areaTasks
2011BMW 3 GT/BMW 4
Framing Line
Preengineering II; Simulation
2011BMW X1
Motor compartment & Side member
Offline programming; Downloads on site; support onsite
2012/2013BMW X5/X6
Upperbody, Underbody; Motor Compartment
Preengineering II, Simulation , Offline programming; Downloads on site; support onsite
2013BMW 7
rear end
Preengineering II; Simulation
2013BMW 5
underbody
Preengineering II
2016BMW G2x
Rear End; Framing line integration
Preengineering II Planning; Concept Design; Simulation
2016BMW G14, G15, G16
Rear End
Preengineering II; Simulation
2016BMW G01/G02
Liftgate/ Roof
Simulation, Offline programming
2016BMW G05/G06/G07
Liftgate
Simulation, Offline programming
2016BMW G08Preengineering II; Simulation
2016X5, X7
Rear End

Preeng, simulation, paths, design
2016X3
Rear End

Simulation, paths, OLP, downloads
20173 Series
Rear End, Framer

Design „Pre Konzept”, PRE II
2017X2
Side Frame, Framing

PRE II
2017G29/J29
Simulation
2017G05
Underbody, Rear End
Paths, MRS, OLP, VIBN, Commissioning, Simulation
2017G01
Rear End
Simulation
2017G05 G06 G07
Tailgate
Simulation, Paths, MRS, OLP, commissioning
2017G20
Endless Door Seal
Simulation; OLP; MRS; VIBN support; online support
2017G01, G02, G05
Glazing Site
Simulation; OLP; MRS; VIBN support; online support
2017G2X
Center Floor
Preengineering, Simulation, Design
2017BMW F39 Framing, Side Walls
Pre-engeeniering
2018G05Simulation, Paths, Simulation, VIBN
2018G42 (2 Series Gran Coupe)Planning, Simulation, Design, Offline Robot Programming, Signals, Offline PLC, EPLAN, VIBN, Build to Print Partner Oversight.
2018G42 (2 Series Gran Coupe)Planning, Simulation, Design, Offline Robot Programming, Signals, Offline PLC, EPLAN, VIBN, Build to Print Partner Oversight.
2020G28 BEVEngineering, Line Construction
2020U11, U12
Assembly lines, Construction Works
2021U11
Planning, Simulation, Construction, Electrical Design and Offline Programming, Electrical Installations, Commissioning, Supervision of the Electrical Workflow

Jaguar

jaguar

JahrWagen und GewerkWagen und Gewerk
2011X152 Bonnet/DoorsSimulation, OLP, Downloads
2013/2014X260 Framing LineSimulation, OLP, Downloads
2013/2014L550 Framing LineSimulation, OLP, Downloads
2015/2016L550/L538 Framing LineCycle Time Reduction, Simulation, OLP
2015/2016Rear Underbody/Assembly UnderbodyX260SBSimulation, OLP, Downloads
2016X540Simulation, OLP, Downloads
2016L462 Bonnet/DoorsSimulation
2016X540 TailgateOLP
2016L462 Framing LineSimulation
2017Jaguar E-Pace X540 Vorderbau; Unterboden; Karosseriegerippe; Untergruppen; Seintenteil Innen/Aussen; Paintbar StationPaths; MRS OLP; VIBN, commissioning
2017L405 Body SiteDesign
2018L550 Body SiteDesign

Opel

opel

JahrWagen und GewerkAufgaben
2010Opel Astra
Framing Line
Simulation;
2008Opel Insignia
Framing Line
Simulation;
2009/2010Opel Zafira
Framing Line
Simulation; Offline programming (OLP, Downloads);
2016Old and New Corsa
Main line respot
Simulation, paths, OLP, downloads

Audi

audi

JahrWagen und GewerkAufgaben
2011AU37X UnderbodyOn site support
2013AU736 Sub assembly groupsSimulation sub assembly groups; Offline programming (OLP, Downloads); uploads; on site support
2014AU49x Rear compartment, Motor compartmentOffline programming (OLP, Downloads); Uploads; on site support
2014AU491/573 Underbody, Framing lineOffline programming (OLP, Downloads); uploads; on site support
2014AU49x Underbody , floor rear and front, front sub assembly groupsSimulation sub assembly groups; Offline programming (OLP, Downloads); Uploads; on site support
2014-2016AU49x
underbody; rear/ front floor;
Offline programming; Commissioning; weld tech
2015AU276
Frontwall, Tailgate
Offline programming
2015AU495 TailgatePaths, OLP, downloads, commissioning robots, online support
2016AU58x UnderbodyOn site support
(OLP, Downloads); uploads; on site support
2017Audi Q6 AU516 Floor Front, Rear FloorSimulation; Paths; MRS OLP; VIBN, commissioning
2017AU49X UB, BoHi, VWA, BoVo

Online comissionning; process parameter for welding, quality, cycle time, production support
2017Audi Q6 AU516 Floor Front, Rear Floor

Loading and checking OLP, standard, production support
2018A3PLC, Robotics, Electric Works
2019e-tron GTSimulation, Commissioning

Volvo

volvo

JahrWagen und GewerkAufgaben
2009Volvo S60
Framing Line; welding lines
Simulation; OLP; commissioning robots
2009Volvo V40
Framing Line; welding lines
Simulation; OLP;
2011Volvo XC60
Framing Line
Simulation; OLP; Online (part areas)
2011Volvo V40
Framing Line
Simulation; OLP; Online (part areas)
2011Volvo
Framing Line; welding lines
Simulation; OLP;
2013Volvo XC90
Doors
OLP; Line Simulation; commissioning
2013Volvo XC90, V60, V70, S60, S80
Disc assembly
Simulation; OLP; commissioning robots
2013-2016S60, S80, V60, XC90, V70, S90, V90, New XC90, New XC60
Final assembly
Simulation, paths, OLP, downloads, commissioning robots, line simulation
2014-2015New XC90, S90, V90
A-shop complete UB
Simulation, paths, OLP, downloads
2016V60, S60, XC60, V40, V40CC, XC40
Final assembly
Simulation, paths, OLP, downloads
2016V431
sidewall
Simulation, offline programming

Volkswagen

volkswagen

YearModel and areaTasks
2011VW Golf 7
Bodyline; Underbody
Simulation, Offline programming; Optimization of cycle time; Downloads, Commissioning, quality,
2012VW Jetta;
Body-underbody
Simulation, Offline programming; Optimization of cycle time; Downloads, Commissioning, quality,
2013VW Passat
Side frame; rear compartment
Simulation, Offline programming; Optimization of cycle time; Downloads, Commissioning, quality,
2013VW Golf
Side frame; rear compartment
Simulation, Offline programming; Optimization of cycle time; Downloads, Commissioning, quality,
2013VW Amarok
Side frame; underbody
Robot programming online
2014-2016VW Touran Tiguan
Assembly; Roof
Offline programming, support offline onsite, online robot programming and PLC Commissioning
2015/2016VW 416
Side frame inner; Front wall; body side
Simulation; Offline programming; Commissioning
2016VW 270 /Polo
Underbody
Simulation, Offline programming; Downloads
2015-2017VN54x CrafterDesign, Simulation, OLP and commissioning
2015
VW326 Tiguan Bodyline

Simulation, paths, OLP, design (framing), downloads
2015 -2016
VW326 Tiguan Bodyline Floor completeSimulation, paths, OLP, design, downloads
2017
V54x AufbauSimulation; Paths; MRS OLP; VIBN, commissioning
2017/2018
VW216 UnderbodySimulation, Paths, Offline programming
2016/2017
VW Polo (also CNG)
VW270 UB, STI, STA
Simulation, Paths
2017
VW Polo (Cross Polo)
VW216 UB, STI, STA
Loading and checking OLP, standard
2018
VW CaddySides of the vehicle (mechanical and electrical package), finish line (electrical package), doors (robotics) and body (electrical package)

Skoda

skoda

JahrWagen und GewerkAufgaben
2011Skoda Octavia
Body/underbodyline
OLP; optimisation of the plant and the cycle time; Downloads; commissioning; robot programming online; process parameters for welding; Laser; roll hemming etc; quality, cycle time
2011Skoda Yeti
Body/underbodyline
OLP; optimisation of the plant and the cycle time; Downloads; commissioning; robot programming online; process parameters for welding; Laser; roll hemming etc; quality, cycle time
2012Skoda Rapid
Underbody
SPS-Programming; Offline und Online.
2013Skoda Rapid, Skoda Octavia, Skoda Fabia
Underbody
commissioning; robot programming online; process parameters for welding; Laser; roll hemming etc; quality, cycle time
2013Skoda Rapid
Bodyline
OLP; MRS; optimisation of the plant and the cycle time;; Downloads; commissioning; robot programming online; process parameters for welding; Laser; roll hemming etc; quality, cycle time
2014Skoda
BIW
OLP; MRS; optimisation of the plant and the cycle time;; Downloads; commissioning; robot programming online; process parameters for welding; Laser; roll hemming etc; quality, cycle time
2015-2016SE326-Snowman
Front wall; Underbody
Offline programming; Commissioning;
2017SK370 TRG/ Boden Hinten
OLP, VIBN, commissioning

Mercedes

mercedes

YearModel and areaTasks
2010Mercedes M; ML; G Simulation; OLP; MRS; optimisation of the plant and the cycle time; Downloads;
2010Mercedes B-ClassSimulation
2011Mercedes A-ClassSimulation
2013Mercedes EIntegration of Model 213; Simulation; OLP; MRS; optimisation of the plant and the cycle time; Downloads
2013Mercedes E/CLS Shooting Brakeinvestigation; point distribution, Simulation; OLP; MRS; optimisation of the plant and the cycle time; Downloads
2013Mercedes GLKSimulation; OLP; MRS; optimisation of the plant and the cycle time; Downloads
2013Mercedes (concept SUV)investigation; point distribution, Simulation; OLP; MRS; optimisation of the plant and the cycle time; Downloads
2010-2011Mercedes E/CLSIntegration of Model 218; Simulation; OLP; MRS; optimisation of the plant and the cycle time; Downloads
2011-2012Mercedes B; CLA Simulation; OLP; MRS; optimisation of the plant and the cycle time; Downloads; commissioning; Roboterprogrammierung-Online; process parameter for welding; Laser; hemm rolling etc; quality, cycle time
2012-2016Mercedes CSimulation; OLP; MRS; optimisation of the plant and the cycle time; Downloads; commissioning and uploads of OLP programms
2016Mercedes C-KlassePreeng
2016-2017Models: W; S; C; ASimulation, paths, OLP
2015-2016BR213
Framing
Mechanical design
2012-2016BR205
body side inner/outer
Simulation, offline programming; commissioning
2016 - 2017
BR167 GLE, GLE Coupe, GLS
Z2: Body Side, Mainline, Z1 Rear End
Preeng, simulation, paths, OLP
2017BR167 Mercedes M Klasse Type: C, V, X Z1/Z2/Teilgate


Simulation; Paths; MRS OLP; VIBN; commissioning
2017BR177 Mercedes A KlasseSimulation; Paths; MRS OLP; VIBN, support
2017W247 Mercedes B Klasse LTR/B Saule
Paths, MRS, OLP
2017VS30 Mercedes Sprinter Unterbau, Anbau, Finish
Simulation,paths, MRS,OLP,Einspielen
2017VS30
Mercedes Sprinter Floor
Simulation,paths, MRS,OLP,Einspielen
2017BR177 Mercedes A-Klasse Front Module, Rear Floor
OLP
2017BR223 Mercedes S-Klasse Side WallSimulation; Paths; MRS OLP; VIBN, commissioning
2017VS30 Mercedes-Benz Sprinter UB
Loading and checking OLP, standard, production support
2018
BR223 Mercedes S-Klasse SWOnline comissionning; process parameter for welding, quality, cycle time, production support
2016-2018
BR463 Mercedes G-Klasse UB, Framing
Simulation, MRS
2016-2018Mercedes Sprinter (VS30)Simulation, Paths, OLP, Commissioning
2020C/A205Body picking lines and side wall production

Porsche

porsche

JahrWagen und GewerkAufgaben
2016PO536Offline programming
2016PO992
Engine hood; tailgate; convertible- top compartment
Simulation
2017PO J1
Paths, MRS, OLP, VIBN, commissioning
2017PO 536
Simulation,paths, MRS,OLP,Einspielen

 

Scania

scania

JahrWagen und GewerkAufgaben
2014-2017NCG
BIW complete SEU
Preenginnering; Simulation; Offline programming; Commissioning; Weld-Tech
2014-2017NCG SLA
Body side left/right; Main framing
Simulation; Offline programming; Virtual commissioning; Commissioning; Weld-Tech
2016NCG SLA
Body side left/right; Main framing, Variant line
Virtual commissioning

Lamborghini

JahrWagen und GewerkAufgaben
2017LB636 Roof
OLP, VIBN, commissioning

Rolls Royce

JahrWagen und GewerkAufgaben
2017RR4, RR5 Floor

Paths; MRS OLP; VIBN, commissioning

Bentley

JahrWagen und GewerkAufgaben
2017BY631
Preengineering, Simulation

Toyota

JahrWagen und GewerkAufgaben
2017Toyota Supra/BMWZ4 G29/J29 WAX lineWAX programs, integration, production assist

Renault

JahrWagen und GewerkAufgaben
2017Renault Clio V Underbody rear assembly, Underbody middle assembly, Underbody linePhase-1 (simulation and 3d design), Phase-2 (simulation and 3d design)

 

Kontakt

UNSERE BÜROS



© 2020 QT Swiss Engineering. Alle Rechte vorbehalten. Impressum | Datenschutzerklärung

GermanUSAPoland